When the material roll enters the feed guide, it is necessary to pay more attention to see whether the positioning plate of the upper and lower feed is aligned between the values without much deviation.
After the material roll enters the roller assembly of the roller wheel, it is necessary to observe whether the upper and lower layers of the roller assembly are aligned without deviation during the process of forming the tile. If there is obvious clamping, distortion, deformation, etc., it is necessary to close the operation of the double-layer tile press equipment at the first time, and carry out corresponding inspection and treatment of the fault part after shutdown.
After the fault troubleshooting, the debugging part should be tested first, and the large amount of mass production should be started under the condition that the two kinds of finished tiles of the double-layer tile press are determined to be consistent with the size requirements of the original drawing after the material is cut off. It is necessary to avoid as much as possible the negligence of failure caused by the operation of the tile press, which leads to the deviation of a large number of sheet metal forming, and the situation of discount or even scrap. This is the least problem that should occur in the production process of the double-layer tile press.
When the fault caused by the operation of the double-layer tile press machine, it must be remembered that after the fault is discharged, the test machine is carried out and the finished plate and the plate pattern drawing are proofread, and the production can continue to be put into production after confirming that it is correct.